Estimated Lead Time:_6 - 8 Weeks.
Control Box DKO 976 Mod.05 Elektro-OilHoneywell manufacturerPrevious Satronic manufacturerMedium fuel oil, bio fuelSafety time TS 5 sec.220/240V Power supply50/60Hz 15VA FrequencyIP 40 ProtectionTF 834, 834.2, 836, 836.2, 804 and 804.2. and TF 804 and 804.2 and DKO 976 N Replaces MachineOil burners with fuel oil do.30 kg/h ApplicationShipping Weight: 1.5 kg